Exposed sandbar at end of airport runway Beginning of spring melt exposing sand and water at end of the airport runway. The group speculates that the open water at this site is created by re-routing of the slough when the levee and airport were built. Process Observed: Open WaterEffect Of Levees And Airport Construction Date Process Observed: Saturday, April 8, 2006 Galleries: End of Airport Runway Gallery